In-line leveling machine

1. On-line internal weld leveling machine stainless steel in-line leveling (also known as internal weld leveling): stainless steel welding into steel pipe and other circular workpieces will appear uneven, uneven inside and outside the weld, leveling is the use of special internal weld leveling equipment in the weld pressure multi-pass rolling, and ultimately the welding leveling, so that The internal and external weld surface is smooth without stratification. It is suitable for oil, chemical, nuclear power, boilers, food, medicine and other industries instead of stainless steel seamless pipes. 2. Automated production process: internal leveling.

1. In-line weld leveling machine

Stainless steel on-line  internal leveling (also known as internal weld leveling): When stainless  steel is welded into circular workpieces such as steel pipes, there  will be unevenness and irregularity inside and outside the weld.  Leveling is to use special internal seam leveling equipment to pressure  multi-pass rolling on the weld, and eventually leveling the welding, so  that the surface of the internal and external welds will not appear  smoothly. Layered. It is suitable for oil, chemical, nuclear power,  boilers, food, medicine and other industries instead of stainless steel  seamless pipes.


2, automated production process:

The  internal leveling stainless steel machinery consists of internal and  external weld leveling stand, hydraulic pneumatic system, automatic  electro-hydraulic-pneumatic control system with PLC control, and also  includes die and rolling fluid circulation equipment. After rolling with  horizontal rollers, the residual height of stainless steel welded pipe  with internal and external weld seam is removed, the cross section of  welded pipe becomes a horizontal ellipse, and the mandrel is stuck in  the welded pipe to follow the welded pipe; after rolling with vertical  rollers, the cross section of welded pipe becomes a positive circle.  When the mandrel and welded pipe are separated from the frame, the  cylinder is pulled back to the appropriate position, and then the second  one is carried out. Rolling cycle


3, product characteristics:

The  internal and external welding seam leveling device of stainless steel  welded pipe is a reciprocating automatic rolling device with built-in  mandrel and roll for rolling stainless steel welded pipe. By controlling  the rolling strength and pass, the requirements of leveling the  internal and external welding seam, completely removing the excess  height of the internal and external welding seam and leveling with the  base metal can be achieved. Popularly speaking, it is to realize  seamless welding of stainless steel welded pipe.


4. Product parameters:

Model

pipe diameter

wall thickness

speed

power

metN40

O.D.1251mm

0.5-2.0mm

0-6m/min

7.5KW

metN 50

O.D.3276mm

0.5-3.0mm

0-6m/min

11KW

metN 60

O.D.50114mm

0.5-3.5mm

0-4m/min

11KW

metN 80

O.D.89168mm

0.5-4.0mm

0-3m/min

15KW

metN 100

O.D.100219mm

0.5-6.0mm

0-2m/min

15KW

metN 120

O.D.150273mm

0.5-8.0mm

0-1.5m/min

18.5KW

Operating procedures


1. Purpose:


1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.


1.2 effective maintenance of equipment.


1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.


2, scope of use:


Welded pipe production: pipe making department.


3, rules:


3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.


3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, whether the grinding wheel, saw blade and  cutting table are normal.


4, boot:


4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.


4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.


4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.


4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.


4.4 Let the  motor run empty for 2-3 minutes before going to work every morning. The  transmission gears are equal to 0. When driving, the operator is not  allowed to leave the machine tool and do other irrelevant things.


4.5  it is strictly prohibited to wear gloves to boot, long sleeved clothes  must wear hand sleeves, and long hair must wear a hat.


4.6 do not wipe the rotating parts when starting.


4.7 correctly adjust the mold, not vigorously under pressure, in place.


4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.


4.9 In the process of  pipe-making, the cutting strip must be consented by the workshop  director, stored in the belt-laying area, and recorded in detail with  the sling operator on the Production Process Card. It must not be  discarded at will.


4.10 If abnormal phenomena are found  in operation, such as smoke, burning odor, sudden fuse burning, sudden  extinguishment of indicator lights and timely switching off the power  switch to be checked out, then turn on operation after troubleshooting.


4.11  the product's length is checked regularly, not more than 6.01 meters,  not less than 6 meters. Strictly controlled between 4mm. The pipe on the  unloading pipe rack should not exceed 95% of the total capacity, so  that the flat mouth personnel should be lifted in time, otherwise the  operator will be responsible for the damage.


5, downtime:


5.1 shut down the power while waiting for the welder to stop.


5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.


5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.


6, on-site finishing or handover.


6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.


6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 pull the scrap stainless steel pipe out of the designated location.


6.4  At the end of work, the specifications and the number of branches  produced by oneself, the number of perforated pipes (branches) and the  waste (kg) are well registered on the production record card, and the  statistics are made by the workshop quality inspection, and the  "Production Process Card" is filled in, so that the operation of the  machine platform of successors and matters needing attention are handed  over. Clean the machine and the regional health before leaving.


寡妇高潮一级毛片免费看大胸 | 亚洲精品秘 一区二区三区在线观看 | 中文字幕在线观看一区二区 | 毛片A片中文字幕在线视频 国产亚无精久久久久久无码 | 强奸丝袜制服美女视频网站 | 日本有码一区二区三区 | 熟女豊満爆乳AV在 | 日韩精品久久无码人妻免费 | 91精品人妖一区二区三区四区 | av24小时国产在线播放 | 国产真实伦子伦老人视频 | 亚洲AV无码国产综合专区 | 人人妻人人澡人人爽不卡视频 | 麻豆精品秘 国产传媒AV消防 | 可以免费看的黄色视频 | 91精品人妻一区二区50路 | 国产50部艳色禁片无码 | 一区二区三区高清无码 | 久久久无码喷水日本动漫一区二区 | 精品乱码一区二区三四 | 亚洲日韩成人AV在线网址 | 亚洲精品网站3D动漫之医院 | 黄污视频网站在线观看污污污网 | 扒丝袜在线影院免费观看 | 国产一级a毛一级a在线观看 | 试看120秒一区二区三区 | 色婷婷一区二区三区久久午夜成人 | 中文字幕一区二区人妻久久 | 又粗又猛又大爽又黄少妇 | 国产亚洲无码在线观看 | 免费在线观看午夜福利 | 91嫩草|国产丨精品入口 | 国偷自产Av一区二区三区麻豆 | 国产精品色情无码视频A片黑寡妇 | 做爰无遮挡全过程免费视频 | 九一精品一区二区三区 | 美女视频黄a视频全免费观看蜜臀 | 成人毛片18女人毛片免费看电影 | 一本一道精品欧美中文字幕 | XXXX迷奷在线观看 | 青青青的成人免费视 |