在线成 人国 产,一级婬片试看60秒,精品无码秘 人妻一区二蜜桃,人人妻人人澡人人爽,免费看的强伦轩一级A片在线观看

Stainless steel pipe making machine stainless steel pipe welding machine

Productrealmap:Productdetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084.jpg


Product details

1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:

Model

(mm)

(mm)

(mm) 

(mm) 

Power

L*W(m) 

Basic specification for pipe making machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m

Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.

2, scope of use:

Workshop management department.

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.

3

4

5

6


91人妻人人澡人人爽精品萌萝社 | 一本大道加勒比东京热 | 亚洲免费av在线免费看 | 男女操逼的视频在线观看 | 免费污视频网站在线观看 | 国产人妻人伦又粗又大爽电影 | 国产又粗又爽又大视频 | 又粗又猛又爽又黄白丝久久 | 91尤物福利视频 | 免费码婬片AAAA片视频软件 | 国产精品久久久久永久免费观看 | 久久天天躁狠狠躁夜夜AV | 一级特黄色一级视频 | 国产午夜激无码毛片久久直播软件 | 69无码人妻互换A片 xxxcom日本黄色 | 午夜免费视频久久久久 | 国産精品久久久久久久 | www.久久久久久久久 | 美女扒穴给你看的香蕉网站 | 欧美一区少妇喷水人妻 | 寡妇高潮免费观看播放 | 国产精品久久久久久久久在线观看 | 新sss在线观看丝 | 精品国产一区二区久久伦理 | 国产精品高潮呻吟久久 | 国产一级毛片国产一级A片农村 | 色情六月丁香色情久久 | 无套猛戳丰满少妇人妻 | 午夜福利视频免费观看 | 天天影视网天天综合色在线播放 | 午夜精品久久久久久久蜜桃 | 肥婆BBB搡BBBB搡搡搡 | AV蜜桃在线免费观看 | 日本成人一区二区三区 | 成人免费毛片 网站 | 一区二区av在线 | 成人做爰黄A片色情泳衣 | 日本青草久久老色鬼 | 欧美一级不卡一二三 | 高清国产一区二区三区 | 91亚洲精品乱码久久久久久蜜桃 |